Future-automation PDM Manual de usuario Pagina 7

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 6
Installation: Stage 3
Page 6 of 14 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PDM1, 2 & Custom - Projector Drop Mechanism
Final checks
- Check the mechanism is working correctly
- Make sure the unit is fully out as shown
- Make sure the projector is secure using the range of nuts, bolts and washers provided
- Slide the mounting plate back into the unit and the slide toggles into the key holes x6
- Attach the bottom plate back to the unit using M5 countersunk bolts
Locking nut
MAKE SURE THE BOTTOM
PLATE AND LOCKING PLATE
ARE SAFE AND SECURE
Mounting
Vista de pagina 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 15 16

Comentarios a estos manuales

Sin comentarios