Future-automation PM Manual de usuario Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
Connecting the PM system to the locking collar
Hook the main body on to the bottom of the ceiling mount part of the system.
Tighten the large nut down to secure the main body in place.
PM - Projector Mount System
Installation: Stage 4
Page 11 of 14 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
All of the Locking Collars on the
different options are the same, and
work in the same way.
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16

Comentarios a estos manuales

Sin comentarios