Future-automation QA2 Manual de usuario Pagina 16

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 15
Manual Head Rotation
Installation: Stage 11
Page 15 of 22 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
QA2 & QA2-60 - Quad Arm




Finally replace the head inner
plate back onto of the head
Loosen the 4 rotational locking
bolts circled in red in the detail
view.
Manually rotate the head into the desired
parallel postion then lock back in place by
tighten the rotational locking bolts back up
X4 Rotational
Locking Bolts
Vista de pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Comentarios a estos manuales

Sin comentarios