Future-automation UBLS Manual de usuario Pagina 9

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 26
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 8
Installation: Stage 4
Page 8 of 24 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
UBLS - Under Bed Lift Swivel
Cable Management
Run the cables into the carriage
around into the hinge section.
Make sure the cables are above
the actuator and have enough
slack for the hinge movement
without straining the cables.
Run the cables through the hinge base and into the side chanel of the telescopic unit as
shown, then run through the cable chain and out the top ready to connect to the screen
Replace all the covers after the cables
have been run through the mechanism
Vista de pagina 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 25 26

Comentarios a estos manuales

Sin comentarios